Projects
One team. End to end.
Every project shown here was shaped by the same team from first conversation to final handover. Design, approvals, and construction, integrated under Shafbuild.
Some are complete. Some are current. Each one reflects how we work: strategy before drawings, drawings that build cleanly, and construction led by the people who designed it.
Secondary Dwelling New Build
Halekulani, NSW
STATUS
Completed
YEAR
2025
SCOPE
Design & Construct
DURATION
6 Months
A turnkey secondary dwelling delivered at the rear of an
established Halekulani property. CDC approved, certified, and
finished to a standard well above what the local market offers,
from architectural detailing through to landscaping and appliances.
Led end to end by Shafbuild under Design & Construct.
Delivered ahead of program and on budget. The completed dwelling
lifted both the equity position and rental yield of the property,
returning a high market appraisal on handover.
Student Accommodation
Kensington, NSW
STATUS
Completed
YEAR
2025
SCOPE
Substantial Commencement
DURATION
2 Weeks
A development application in Kensington faced lapsing without
physical commencement of works. The owner needed to demonstrate
substantial commencement to keep the DA active and protect the
approved development rights.
Shafbuild scoped, executed, and certified the minimum works
required: targeted demolition, concrete works, and documented
evidence of commencement. The certifier sign-off was the critical
deliverable, securing the DA's ongoing validity and the client's
development pathway forward.
Beachfront Apartment - U907
Cronulla, NSW
STATUS
Completed
YEAR
2025
SCOPE
Design & Construct
DURATION
8 Weeks
A full apartment renovation on the ninth floor of a Cronulla
beachfront building. Designed in-house and delivered end to end
on an eight-week program.
Polyurethane joinery, 60mm stone benchtops with full stone
splashback, premium appliances and tapware throughout. Two
bathrooms and laundry stripped and rebuilt with custom vanities,
tiling, waterproofing, and joinery. Two bedrooms refreshed with
upgraded built-in wardrobes. Full reflooring and complete repaint
across the apartment. The result: a meaningful uplift in both
capital value and rental yield.
Beachfront Apartment - U911
Cronulla, NSW
STATUS
Completed
YEAR
2025
SCOPE
Design & Construct
DURATION
8 Weeks
A full apartment renovation in a Cronulla beachfront building.
Designed in-house and delivered end-to-end on an eight-week
program.
Polyurethane joinery, 60mm stone benchtops with full stone
splashback, premium appliances and tapware throughout. Bathroom
and laundry stripped and rebuilt with a custom vanity, tiling,
waterproofing, and joinery. Bedroom refreshed with upgraded
built-in wardrobe. Full reflooring and complete repaint across
the apartment. The result: a meaningful uplift in both capital
value and rental yield.
Strata Structural Advisory
Lilyfield, NSW
STATUS
Completed
YEAR
2025
SCOPE
Structural Consultancy
DURATION
1 Week
A strata apartment owner in Lilyfield required structural advice
on a proposed internal wall removal. The work needed to be
assessed, certified, and documented to satisfy both strata
requirements and building compliance.
Shafbuild provided structural consultation and issued the
required certification. A small engagement with a clear outcome:
the client could proceed with confidence, with all approvals
and structural compliance in place.
Heritage Home Renovation
Randwick, NSW
STATUS
In Progress
YEAR
2026
SCOPE
Design & Approval
DURATION
8 Weeks
A heritage home in Randwick with a brief that asks a lot of it.
More space, more light, a second-storey extension, and structural
changes throughout. A large-scope renovation made harder by the
heritage controls Randwick Council applies to homes in this pocket.
Shafbuild leads the full process end-to-end: consultant coordination,
design strategy, and an approvals pathway designed to secure as much
scope as the site allows. On a project of this complexity, the
approvals strategy shapes everything that follows.
Whole Home Renovation
Wyong, NSW
STATUS
In Progress
YEAR
2026
SCOPE
Design & Construct
DURATION
12 Weeks
A full home renovation in Wyong following two decades of deferred
maintenance, failed waterproofing, and major water ingress. The
property required strategic remediation before any cosmetic uplift
could be considered.
Shafbuild led the project end-to-end under one Design & Construct
contract. Scope included licensed asbestos works, external remedial
works, structural remediation, full kitchen and bathroom upgrades,
flooring, painting, and carpentry throughout. The completed home
returned a meaningful uplift in both capital value and rental yield.
Two Storey Residence - Lot 25
Leppington, NSW
STATUS
In Progress
YEAR
2026
SCOPE
Design & Construct
DURATION
TBC
A two-storey residence in Leppington, delivered for EG Advisory as
part of a two-lot investment development. One of two standalone
homes (Lots 25 and 26) engaged on a full turnkey Design & Construct
model, with Shafbuild responsible for end-to-end delivery from
early planning through to certification and handover.
Shafbuild leads the Design & Construct delivery model, manages the
full CDC approvals pathway, and coordinates architects, engineers,
and specialist consultants in alignment with the client's commercial
brief. Early construction input is provided to de-risk approvals
and delivery, with Shafbuild overseeing programme, quality, site
delivery, certification, and structured handover.
Currently in design and approvals, moving to construction once
subdivision works complete later this year.
Two Storey New Build - Lot 26
Leppington, NSW
STATUS
In Progress
YEAR
2026
SCOPE
Design & Construct
DURATION
TBC
A two-storey residence in Leppington, delivered for EG Advisory as
part of a two-lot investment development. One of two standalone
homes (Lots 25 and 26) engaged on a full turnkey Design & Construct
model, with Shafbuild responsible for end-to-end delivery from
early planning through to certification and handover.
Shafbuild leads the Design & Construct delivery model, manages the
full CDC approvals pathway, and coordinates architects, engineers,
and specialist consultants in alignment with the client's commercial
brief. Early construction input is provided to de-risk approvals
and delivery, with Shafbuild overseeing programme, quality, site
delivery, certification, and structured handover.
Currently in design and approvals, moving to construction once
subdivision works complete later this year.